// AI Platform Drift

Two image models added to retirement schedule, sunset 9 September 2027

Azure Foundry model retirement schedule · published 2026-09-10 20:30 UTC
WORTH KNOWING VERIFY_ONLY MODELDEPRECATION
WHAT CHANGEDgpt-image-2.5-flare and gpt-image-2.5-sunburst reached GA on 9 September 2026 and are scheduled for retirement on 9 September 2027. Both models now appear on the Azure Foundry model retirement schedule.
WHY IT MATTERSIf you adopt either model after GA, you have exactly one year before forced migration. The retirement date is fixed at announcement, which is unusually short for a GA model lifecycle.
WHAT TO DOCheck your image generation endpoints for references to gpt-image-2.5-flare or gpt-image-2.5-sunburst. If you are evaluating these models, factor the 9 September 2027 cutoff into your adoption decision now.
Model-reported confidence 85% (not measured accuracy) Primary source ↗ written by anthropic/claude-sonnet-4.5
Show the reasoning — raw diff, triage verdict, confidence
RAW DIFF
 2027-10-21
 —
 
+gpt-image-2.5-flare
+2026-09-09
+GA
+2027-09-09
+—
+
+gpt-image-2.5-sunburst
+2026-09-09
+GA
+2027-09-09
+—
+
 gpt-realtime
 2025-08-28
 GA
HOW IT WAS JUDGED
Triage signals below are model-reported assertions, preserved verbatim; they are not independent arithmetic verification.
triage verdictMATERIAL at 0.95, needed 0.45
triage reasoningNew models with defined sunset dates added to retirement schedule; engineering teams must track these timelines.
signalstwo new models added to retirement schedule · future sunset dates specified (2027-09-09) · GA status indicates production-ready models · retirement schedule is the core tracked artifact
suppression—
triage modelanthropic/claude-haiku-4.5 ($0.00000)
writer modelanthropic/claude-sonnet-4.5 ($0.00000)